Projects Snapshot
Tier 1 Projects (Short Term Production Horizon)
GOLD AND SULPHIDE NICKEL FOCUS, WESTERN AUSTRALIA
- East Kalgoorlie Blair North Project Recent Major Gold Intercepts (to 04/07/2008):
- 6m downhole (from 72m to 78m) @ 9.5g/t Au including 1m (from 72m to 73m @ 34.55g/t Au).
- 19m downhole (from 59m to 78m) @ 3.8g/t Au (within a mineralised zone of 41m from 37m to 78m @ 2.27g/t Au.)
- 25m downhole (from 99m to 124m) @ 4.05g/t Au including an internal high grade zone of 10m (from 107m to 117m) @ 8.39g/t Au.
- 24m downhole (from 36m to 60m) @ 2.16g/t Au, including an internal high grade zone of 8m (from 37m to 45m) @ 5.64g/t Au.
- East Kalgoorlie Blair North Project New Nickel Discovery:
- 8m downhole (from 156m to 164m) @ 1.84% Ni (Sulphide);Including:
- 3m downhole (from 156m to 159m) @ 2.63% Ni (Sulphide).
- 2m downhole (from 161m to 163m) @ 2.94% Ni (Sulphide).
- 1m downhole (from 161m to 162m) @ 4.40% Ni (Sulphide).
- Close to potential processing plants (Jubilee, Black Swan, Kambalda).
LATERITE NICKEL FOCUS POLAND, SZKLARY NICKEL PROJECT
- Inferred Mineral Resource 16.8Mt @ 0.6% Ni for 94,000t contained metal.
- Heads of Agreement with Polish Copper Giant KGHM for undertaking of Feasibility Study into joint development of the deposit.
- Feasibility Study expected to commence in early 2009.
Click here for more information.
Tier 2 Projects (Medium Term Production Horizon)
GOLD FOCUS POLAND
Radzimowice Gold Project:
- Previously exploited gold, silver, arsenic, copper.
- Historical grades of 10 – 44g/t gold.
- Recent 3D model digitised from series of historical mining plans exposes potential for significant down dip extension of gold vein systems.
- Targeting gold endowment in range of 1500 – 2500 oz per vertical metre.
- Total concession area 10.86km2.
- Close to existing infrastructure.
- Commencement of work programmes.
- Preliminary drilling programme due to commence Q1 2009.
URANIUM, MOLYBDENUM, HEAVY MINERALS, COPPER, TIN, IRON FOCUS WESTERN AUSTRALIA
East Kimberley Durack Range Project containing up to: 9.7% copper, 0.136% uranium, 2% thorium, 8% titanium oxide, 8% zircon, 5% monazite, 60% ilmenite, 0.297% molybdenum.
- >1200 square kilometres tenement area.
- Up to 95% heavy minerals in 12 kilometre strike length.
- Planning of exploration programmes has commenced.
Click here for more information.
Tier 3 Projects (Longer Term Production Horizon)
URANIUM, NICKEL, BASE METALS, COPPER, COBALT, ZINC FOCUS
NORTHERN TERRITORY
- > 8,000 square kilometres tenement area (6 projects).
- Close to Alice Springs infrastructure.
- Milton Park Project: excellent potential secondary uranium deposits. Extensive airborne surveys 2008.
Click here for more information.
